微信图片_20251026154503_285_1(1).jpg

Coil Spraying and Drying Line

Technical Parameters of Coil Spray Painting and Drying LineThese technical parameters are formulated for the coil spray painting and drying line modelCSDL-1220. The equipment features a core design of "adapting to coil widths of 0.5-1.2m, a total line length of 20m, and an effective dryingCoil Spraying and Drying Line,Coil Spray Painting Assembly Line,Coil Spraying Line,Coil Coating Line
Send Inquiry

Products Description

Technical Parameters of Coil Spray Painting and Drying Line

These technical parameters are formulated for the coil spray painting and drying line model CSDL-1220. The equipment features a core design of "adapting to coil widths of 0.5-1.2m, a total line length of 20m, and an effective drying section length of 12m". It is specifically engineered for continuous surface spray painting and curing of metal coils (such as aluminum coils, steel coils) and plastic coils. The line offers automatic spray painting, precise temperature control, efficient drying, and environmental compliance, meeting the strict requirements of industries like building materials, home appliances, and auto parts for coil surface coating adhesion, flatness, and production efficiency.

1. Basic Specification Parameters

Parameter CategorySpecific Value/DescriptionAdaptation Description
Overall DimensionsTotal line length: 20m (feeding section: 2m + pre-treatment section: 2m + spray painting section: 2m + leveling section: 2m + drying section: 12m + winding section: 2m); total width: 2.2m; total height: 3.5mSegmented structure adapts to workshop layout. Maintenance space is reserved for each functional section. The unwinding and winding sections support coils with a weight ≤ 5 tons.
Core Working DimensionsCoil width adaptation: 0.5-1.2m; coil thickness: 0.1-2.0mm; effective width of drying section: 1.3m; internal height of drying section: 0.8mCompatible with mainstream industrial coil specifications. Guide rollers can be adjusted to adapt to coils of different widths, ensuring uniform spray painting.
Equipment WeightApproximately 12 tonsMatches workshop floor load standards (≥15kN/㎡). Reinforced bases are added to the winding section to distribute weight.
Installation EnvironmentTemperature: 5-45℃; humidity: ≤80%; well-ventilated; free of dust and strong magnetic interference; altitude: ≤1000mMeets the environmental requirements of industrial painting workshops and prevents dust from affecting coating quality.

2. Core Performance Parameters

Parameter CategorySpecific Value/DescriptionTechnical Advantages
Operating SpeedStepless adjustment of line speed: 1-10m/min; speed stability: ±0.1m/minMatches the spray painting and drying needs of different coating thicknesses (10-100μm), ensuring uniform coating without sagging.
Spray System PerformanceNumber of spray guns: 4 (2 upper, 2 lower); spray pressure: 0.3-0.6MPa; coating thickness error: ±5μm; paint utilization rate: ≥90%Automatic electrostatic spray technology reduces paint waste. Synchronous upper and lower spray painting improves production efficiency.
Drying Temperature ControlDrying section with 3-zone temperature control; temperature range: 60-200℃; temperature fluctuation: ±2℃; independent temperature adjustment for each zoneMeets the process requirements of "preheating and leveling - constant temperature curing - cooling and shaping". Adapts to different types of paints (e.g., PU, PE, powder coatings).
Production EfficiencyTaking 1.2m-wide, 0.5mm-thick aluminum coils as an example, with a coating thickness of 50μm, the daily output (8 hours) is ≥4000㎡Continuous operation design reduces downtime for material change, meeting large-scale production needs.

3. Key System Parameters

3.1 Coil Conveying and Positioning System

  • Conveying method: Active guide rollers + tension control system. Guide rollers are made of polyurethane (scratch-resistant), with a roller spacing of 300mm and a surface precision of Ra ≤ 0.8μm.

  • Tension control: Automatic tension adjustment. Tension range: 50-500N; tension stability: ±5N. Prevents coil stretching or wrinkling.

  • Deviation correction system: Photoelectric deviation correction device. Correction precision: ±0.5mm; response time: ≤0.1s. Ensures the coil runs in the center.

3.2 Spray Painting and Leveling System

  • Spray device: Automatic electrostatic spray guns. Nozzle diameter: 0.8-1.5mm (adjustable); spray gun moving speed: 5-15m/min. Supports reciprocating spray painting.

  • Paint supply: Stainless steel paint tank (volume: 50L) with automatic stirring (rotational speed: 30-60r/min) and precision filtration (precision: 10μm).

  • Leveling system: Air velocity in the leveling section: 0.3-0.5m/s; temperature: 40-60℃; adjustable leveling time: 10-30s. Removes coating bubbles.

3.3 Drying and Hot Air System

  • Heating method: Natural gas heating (burner heat load: 80kW) + waste heat recovery. Thermal efficiency: ≥90%. Electric heating (total power: 120kW) is also optional.

  • Hot air circulation: Side-supply and side-suction bidirectional circulation. Each zone is equipped with 3 centrifugal fans (power: 2.2kW/fan). Air velocity: 2-3m/s; hot air uniformity: ≤±3℃.

  • Thermal insulation design: The drying section furnace body adopts 150mm-thick rock wool insulation layer. External surface temperature: ≤50℃ (at 25℃ ambient temperature); heat loss rate: ≤4%.

3.4 Environmental Protection and Waste Gas Treatment System

  • Waste gas collection: Fully enclosed negative pressure collection in the spray painting and leveling sections. Negative pressure value: -50Pa; collection efficiency: ≥98%.

  • Treatment equipment: Activated carbon adsorption + catalytic combustion device. Treatment efficiency: ≥95%; VOCs emission concentration: ≤20mg/m³. Complies with the GB 30981-2021 standard.

  • Paint mist filtration: Pre-installed water curtain cabinet + high-efficiency filter cotton. Paint mist removal rate: ≥99%. Prevents clogging of subsequent equipment.

3.5 Control System

  • Control core: PLC + 15-inch industrial touchscreen. Supports Chinese/English interface switching and three-level operation authority management.

  • Detection and feedback: Infrared temperature detector (precision: ±0.5℃), online coating thickness gauge (real-time detection), tension sensor, and deviation correction sensor.

  • Intelligent functions: Process parameter storage (≥200 groups), production data statistics (output, energy consumption), fault alarm (sound-light + on-screen prompt), and optional remote diagnosis.

3.6 Safety System

  • Temperature and fire prevention: Over-temperature alarm (±10℃) in the drying section, automatic gas/electricity cut-off. Equipped with CO concentration detector and spray fire-extinguishing device.

  • Mechanical protection: Protective barriers for all moving parts, emergency stop buttons (1 every 2m), and equipment grounding resistance ≤4Ω.

  • Electrical safety: Electrical cabinet with IP54 protection rating. Equipped with leakage, overload, and short-circuit protection functions.

4. Adaptable Materials and Processes

Adaptable Material TypeRecommended Process ParametersCoating Quality Standards
Aluminum coils/aluminum alloy coils (for architectural decoration)Line speed: 3-5m/min; spray pressure: 0.4MPa; coating thickness: 30-50μm; drying temperatures: Zone 1 (80℃), Zone 2 (150℃), Zone 3 (120℃)Adhesion: ≤Grade 1 (cross-cut test); hardness: ≥2H; salt spray resistance: ≥500h; no pinholes or orange peel defects.
Cold-rolled steel coils (for home appliance casings)Line speed: 2-4m/min; spray pressure: 0.5MPa; coating thickness: 50-80μm; drying temperatures: Zone 1 (100℃), Zone 2 (180℃), Zone 3 (150℃)Adhesion: ≤Grade 0; flexibility: ≤2mm; impact resistance: ≥50kg·cm; gloss deviation: ±5°.
PVC plastic coils (for advertising decoration)Line speed: 5-8m/min; spray pressure: 0.3MPa; coating thickness: 10-30μm; drying temperatures: Zone 1 (60℃), Zone 2 (100℃), Zone 3 (80℃)Good adhesion; no cracking or peeling; weather resistance: ≥1000h (artificial accelerated aging).

5. Energy Consumption and Operation & Maintenance Parameters

  • Energy consumption indicators: Natural gas-heated type: gas consumption ≤8m³/h (full load); electric-heated type: power consumption ≤100kW·h/h (full load); waste heat recovery system saves energy by 25%-30%.

  • Maintenance cycle: Guide roller cleaning (daily), filter cotton replacement (every 3 days), spray gun nozzle cleaning (weekly), activated carbon replacement (every 3 months), and burner maintenance (every 6 months).

  • Service life of wearing parts: Spray gun nozzles: ≥500h; polyurethane layer of guide rollers: ≥10000h; filter cotton: ≥200h; activated carbon: ≥1500h.

The equipment realizes fully automated operation from coil feeding to finished product winding through precise control of coil conveying, optimization of spray painting processes, and efficient design of the drying system. It can be customized to adjust parameters such as spray pressure, drying temperature, and line speed according to users' specific coil specifications, paint types, and coating requirements. Meanwhile, it supports the addition of extended functions such as double-sided spray painting and online film lamination to meet diversified production needs.